A notice of hearing is a legal document that announces an AER hearing. The AER holds hearings to decide on applications, regulatory appeals, and other matters related to energy developments.
The AER publishes all notices of hearing to this page and often in local or regional newspapers. The AER also sends notices of hearing directly to interested parties. The notice of hearing is an important document for several reasons:
The AER also issues other notices related to hearings, including notices scheduling, rescheduling, adjourning, or cancelling hearings.
Proceeding ID | Application Reference | Notice Type | Company Name | Important Dates | Notice Date |
---|---|---|---|---|---|
360 | Application 1877294 | Notice of Prehearing Meeting - Common Carrier and Rateable Take Order Applications | Bearspaw Petroleum Ltd. | April 19, 2018 | |
357 | Application 1903103 | Notice of Hearing - 9.86 kilometres northwest of the Town of Wembley | Encana Corporation | April 06, 2018 | |
360 | Application 1877294 | Notice of Hearing - Common Carrier and Rateable Take Order Applications | Bearspaw Petroleum Ltd. | March 16, 2018 | |
359 | Application 1869537 | Notice of Hearing - Common Carrier and Common Processor Applications | Tykewest Limited | March 12, 2018 | |
347 | Application 1866028 | Notice of Adjournment of Hearing - Environmental Protection Order of July 7, 2016 | Husky Oil Operations Limited and Gibson Energy Inc. | February 22, 2018 | |
358 | Application 1874178 | Notice of Hearing - Six Kilometres North of Thorsby | Blackspur Oil Corp. | February 20, 2018 | |
355 | Application 1880447 | Notice of Scheduling of Hearing - LSD 15-18-063-03W4M | Canadian Natural Resources Limited |
March 6, 2018 at 9:00 a.m. Hearing commences. |
January 09, 2018 |
356 | Application 1861615 | Notice of Scheduling of Hearing - Location: SE- and SW-10-056-21W4M | Value Creation Inc. |
February 6, 2018 at 9:00 a.m. |
January 04, 2018 |
350 | Application 1778538 | Notice of Rescheduling of Hearing | Prosper Petroleum Ltd |
January 9, 2018, at 9:00 a.m. Hearing commences. |
November 22, 2017 |
347 | Application 1866029 | Notice of Rescheduling Hearing - Environmental Protection Order of July 7, 2016 | Husky Oil Operations Limited and Gibson Energy Inc. |
March 1, 2018 at 9:00 a.m. |
November 08, 2017 |
347 | Application 1866029 | Notice of Adjournment of Hearing - Environmental Protection Order of July 7, 2016 | Husky Oil Operations Limited and Gibson Energy Inc. | October 31, 2017 | |
350 | Application 1778538 | Notice of Adjournment of Hearing | Prosper Petroleum Ltd | October 12, 2017 | |
354 | WA application 001-00385804 | Notice of Cancellation of Hearing - Red Deer River, 35 kilometres north of Brooks | Inter Pipeline Ltd. | October 06, 2017 | |
350 | Application 1778538 | Notice of Scheduling of Hearing - Rigel Oil Sands Project | Prosper Petroleum Ltd | October 04, 2017 | |
346 | Application 1842705 | Amended Notice and Scheduling of Hearing - 2.3 Kilometres East of Rocky Rapids | Bashaw Oil Corp. |
October 31, 2017 - Final date to file a request to participate. November 7, 2017 - Final date for response from the applicant on any requests to participate. |
October 04, 2017 |
355 | Application 1880447 | Notice of Hearing - LSD 15-18-63-03W4M | Canadian Natural Resources Limited |
October 17, 2017 - Final date to file a request to participate. October 24, 2017 - Final date for response from the applicant on any requests to participate. |
September 27, 2017 |
356 | Application 1861615 | Notice of Hearing - SE and SW10-56-21W4M | Value Creation Inc. |
October 13, 2017 - Final date to file a request to participate. October 20, 2017 - Final date for response from the applicant on any requests to participate. |
September 26, 2017 |
354 | WA application 001-00385804 | Notice of Scheduling of Hearing - Regulatory Appeal - Red Deer River, 35 kilometres north of Brooks | Inter Pipeline Ltd. |
November 1, 2017, at 9:00 a.m. |
August 09, 2017 |
353 | Application 1866519 | Notice of Scheduling of Hearing - White Spruce Pipeline Project | TransCanada Pipelines Limited | July 31, 2017 | |
346 | Application 1842705 | Amended Notice of Hearing - Proximity critical sour oil wells | Bashaw Oil Corp. |
August 15, 2017 - Final date to file a request to participate. August 22, 2017 - Final date for response from the applicant on any requests to participate. |
July 25, 2017 |
354 | WA application 001-00385804 | Notice of Hearing - Regulatory Appeal - Red Deer River, 35 kilometres north of Brooks | Inter Pipeline Ltd. |
July 14, 2017 - Final date to file a request to participate. |
June 29, 2017 |
347 | Application 1866028 | Notice of Rescheduling of Hearing - Environmental Protection Order of July 7, 2016 | Husky Oil Operations Limited and Gibson Energy Inc. |
November 6, 2017 - Public hearing date |
June 28, 2017 |
346 | Application 1842705 | Notice of Scheduling of Hearing - Proximity critical sour oil wells | Bashaw Oil Corp. |
September 6, 2017 at 9:00 a.m. Hearing commences. |
June 02, 2017 |
353 | Application 1866519 | Notice of Hearing - White Spruce Pipeline Project | TransCanada Pipelines Limited |
June 29, 2017 - Final date to file a request to participate. July 6, 2017 - Final date for response from TransCanada Pipelines Limited on any requests to participate. |
June 01, 2017 |
352 | Application 1873382 | Notice of Hearing – Pooling Order | 840586 Alberta Ltd. |
May 25, 2017 - Final date to file a request to participate. May 30, 2017 - Final date for response from the applicant on any requests to participate. |
May 16, 2017 |
346 | Application 1842705 | Notice of Prehearing Meeting - Proximity critical sour oil wells | Bashaw Oil Corp. |
March 13, 2017, at 9:00 a.m. - Prehearing meeting |
February 28, 2017 |
347 | Application 1866028 | Notice of Scheduling of Hearing - Regulatory Appeals | Husky Oil Operations Limited and Gibson Energy Inc. |
May 3, 2017, at 9:00 a.m. Hearing commences. |
February 27, 2017 |
350 | Application 1778538 | Notice of Hearing - Prosper Rigel Project | Prosper Petroleum Ltd |
Feb 14, 2017 - Final date to file a request to participate |
January 30, 2017 |
346 | Application 1842705 | Notice of Hearing - Proximity-critical sour oil wells | Bashaw Oil Corp. |
January 17, 2017 - Final date to file a request to participate. |
December 20, 2016 |
347 | Application 1866028 | Notice of Hearing - Regulatory Appeals - Proceeding ID 347 Environmental Protection Order of July 7, 2016 | Husky Oil Operations Limited and Gibson Energy Inc. |
January 10, 2017 - Final date to file a request to participate. January 17, 2017 - Final date for Husky, Gibson, and the AER’s Closure and Liability Group to submit responses to any request to participate. |
December 16, 2016 |
344 | Application 1709793 | Public Comment Period - Frontier Oil Sands Mine Project | Teck Resources Ltd. |
October 17, 2016 - Written comments submission deadline in either official language. |
August 17, 2016 |
343 | Application 1833192 | Notice of Scheduling of Hearing - Gilby Field | Bonavista Energy Corporation |
October 18, 2016 |
August 08, 2016 |
343 | Application 1833192 | Notice of Hearing - Gilby Field | Bonavista Energy Corporation |
June 14, 2016 - Final date to file a request to participate. June 21, 2016 - Final date for response from the applicant on any requests to participate. |
May 31, 2016 |
341 | Application 1823846 | Notice of Scheduling of Hearing - Rocky 7 Pipeline Project | Shell Canada Limited |
Hearing - September 13, 2016 |
May 17, 2016 |
337 | Application 1827949 | Notice of Cancellation of Hearing - Section 33 Pipeline Removal | R. Schulze and M. Schulze | April 06, 2016 | |
342 | Proceeding 1852673 | Notice of Hearing - Regulatory Appeal of Administrative Penalty Notices | Canadian Natural Resources Limited |
April 13, 2016 - Final date to file a request to participate April 20, 2016 - Final date for responses from CNRL and EOP to any requests to participate |
April 06, 2016 |
341 | Application 1823846 | Amended Notice of Hearing - Rocky 7 Pipeline Project | Shell Canada Limited |
March 16, 2016 Final date to file a request to participate. March 23, 2016 Final date for response from Shell on any requests to participate. |
February 25, 2016 |
341 | Application 1823846 | Notice of Hearing - Rocky 7 Pipeline Project | Shell Canada Limited |
March 16, 2016 Final date to file a request to participate. March 23, 2016 Final date for response from Shell on any requests to participate. |
February 24, 2016 |
338 | Application 1837447 | Notice of Scheduling of Hearing - Boundary Lake South Field | Canadian Natural Resources Limited | January 07, 2016 | |
336 | Application 1820596 | Notice of Scheduling of Hearing - Pool Delineation, Crossfield Basal Quartz C & V Pools | Bearspaw Petroleum Ltd. | January 21, 2016 | |
338 | Application 1837447 | Notice of Hearing - Regulatory Appeal - Proceeding ID 338 | Canadian Natural Resources Limited |
November 19, 2015 - Final date for interested parties to file a request to participate. November 26, 2015 - Final date for CNRL to respond to any requests to participate. |
October 28, 2015 |
336 | Application 1820596 | Notice of Hearing - Pool Delineation, Crossfield Basal Quartz C & V Pools | Bearspaw Petroleum Ltd. |
November 20, 2015 - Final date to file a request to participate. November 27, 2015 - Final date for response from the applicant on any requests to participate. |
November 05, 2015 |
334 | Application 1771853 et al. | Notice of Adjournment of Hearing - Grand Rapids Pipeline Project - Oral Hearing to Consider Grand Rapids’ Compliance with Condition 11 of 2014 ABAER 012 | Grand Rapids Pipeline GP Ltd. | November 27, 2015 | |
336 | Application 1820596 | Notice of Prehearing Meeting - Pool Delineation, Crossfield Basal Quartz C & V Pools | Bearspaw Petroleum Ltd. | December 17, 2015 | |
337 | Application 1827949 | Notice of Hearing - R. Shulze and M. Schulze - Section 33 Pipeline Removal | R. Shulze and M. Schulze |
October 9, 2015 - Final date to file a request to participate. October 16, 2015 - Final date for response from the applicant on any requests to participate. |
September 25, 2015 |
331 | Application 1806873 | Notice of Rescheduling of Hearing - Fox Creek to Namao Pipeline Expansion Project | Pembina Pipeline Corporation | October 22, 2015 | |
334 | Application 1771853 et al. | Notice of Rescheduling of Hearing - Oral Hearing to Consider Grand Rapids’ Compliance with Condition 11 of 2014 ABAER 012 | Grand Rapids Pipeline Project | August 17, 2015 | |
334 | Application 1771853 et al | Notice of Rescheduling of Hearing - Oral Hearing to Consider Grand Rapids Compliance with Conditions 12 and 13 of 2014 ABAER 012 | Grand Rapids Pipeline Project | July 17, 2015 | |
334 | Applications 1771853 et al. | Notice of Rescheduling of Hearing - Oral Hearing to Consider Grand Rapids’ Compliance with Condition 11 of 2014 ABAER 012 | Grand Rapids Pipeline Project | July 09, 2015 | |
333 | Proceeding No. 1820248 | Notice of Cancellation of Hearing - Section 106 - Oil and Gas Conservation Act | Bryce L. Karl | June 30, 2015 | |
334 | Applications 1771853 et al. | Notice of Rescheduling of Hearing - Oral Hearing to Consider Grand Rapids’ Compliance with Condition 11 of 2014 ABAER 012 | Grand Rapids Pipeline GP Ltd. | June 24, 2015 | |
334 | Applications 1771853 et al. | Notice of Adjournment of Hearing - Oral Hearing to Consider Grand Rapids’ Compliance with Condition 11 of 2014 ABAER 012 | Grand Rapids Pipeline GP Ltd. | June 23, 2015 | |
334 | Application 1771853 et al. | Notice of Scheduling of Hearing - Grand Rapids Pipeline Project - Oral Hearing to Consider Grand Rapids’ Compliance with Conditions 12 and 13 of 2014 ABAER 012 | Grand Rapids Pipeline GP Ltd. | June 15, 2015 | |
332 | Application 1811400 | Notice of Cancellation of Hearing - Horseshoe Canyon Coal Fairway Pool | Ember Resources Inc. | June 10, 2015 | |
332 | Application 1811400 | Notice of Adjournment of Hearing - Horseshoe Canyon Coal Fairway Pool | Ember Resources Inc. |
April 30, 2015 - Final date for interested parties to file a request to participate |
June 02, 2015 |
331 | Applications 1806873 | Notice of Adjournment of Hearing - Fox Creek to Namao Pipeline Expansion Project | Pembina Pipeline Corporation | May 28, 2015 | |
334 | Applications 1771853 et al. | Notice of Scheduling of Hearing - Grand Rapids Pipeline Project - Oral Hearing to Consider Grand Rapids’ Compliance with Condition 11 of 2014 ABAER 012 | Grand Rapids Pipeline GP Ltd. | May 20, 2015 | |
332 | Application 1811400 | Notice of Scheduling of Hearing - Horseshoe Canyon Coal Fairway Pool | Ember Resources Inc. | May 01, 2015 | |
332 | Application 1811400 | Notice of Hearing - Horseshoe Canyon Coal Fairway Pool | Ember Resources Inc. | April 23, 2015 | |
327 | Application 1806140 | Notice of Cancellation of Hearing - Elmworth Field | Encana Corporation | April 21, 2015 | |
331 | Applications 1806873, etc. | Notice of Hearing - Fox Creek to Namao Pipeline Expansion Project | Pembina Pipeline Corporation |
June 22, 2015 - Final date for submissions from all interested parties. June 29, 2015 - Final date for response submissions from the applicant. |
April 17, 2015 |
333 | Proceeding 1820248 | Notice of Hearing - Section 106 of the Oil and Gas Conservation Act | Bryce L. Karl | April 17, 2015 | |
333 | Proceeding 1820248 | Notice of Intention to Issue a Declaration - Section 106 of the Oil and Gas Conservation Act | Bryce Lee Karl | January 28, 2015 | |
327 | Application 1806140 | Notice of Hearing - Elmworth Field | Encana Corporation |
January 8, 2015 - Final date for interested parties to file a request to participate. January 15, 2015 - Final date for response from the applicant on any requests to participate. |
December 15, 2014 |
318 | Application 1790549 | Notice of Cancellation of Hearing - Section 33 Pipeline Removal | Parkland Estates Development Corp. | December 05, 2014 | |
318 | Application 1790549 | Notice of Adjournment of Hearing - Section 33 Pipeline Removal | Parkland Estates Development Corp. | November 03, 2014 | |
318 | Application 1790549 | Notice of Scheduling of Hearing - Section 33 Pipeline Removal | Parkland Estates Development Corp. | September 12, 2014 | |
321 | Application 1800423 | Notice of Cancellation of Hearing - Valhalla Area | Canadian Natural Resources Ltd. | September 12, 2014 | |
324 | Proceeding 1805858 | Notice of Hearing - Regulatory Appeal | Pembina Pipeline Corporation |
September 29, 2014 - Final date for interested parties to file a request to participate. October 6, 2014 - Final date for the approval holder, Pembina, to submit responses to any requests to participate. |
September 04, 2014 |
320 | Application 1788009 | Notice of Scheduling of Hearing - Turner Valley Field | Legacy Oil + Gas Inc. | August 26, 2014 | |
320 | Application 1788009 | Amended Notice of Hearing - Turner Valley Field | Legacy Oil + Gas Inc. | August 25, 2014 | |
321 | Proceeding 1800423 | Notice of Scheduling of Hearing - Valhalla Field | Canadian Natural Resources Ltd. | August 14, 2014 | |
320 | Application 1788009 | Notice of Hearing - Turner Valley Field | Legacy Oil + Gas Inc. |
August 13, 2014 - Final date for interested parties to file a request to participate. August 20, 2014 - Final date for response from Legacy on any request(s) to participate. |
July 29, 2014 |
318 | Application 1790549 | Notice of Hearing - Section 33 Pipeline Removal | Parkland Estates Development Corp. |
August 19, 2014 - Final date for interested parties to file a request to participate. September 2, 2014 - Final date for response from Parkland on any requests to participate. |
July 28, 2014 |
321 | Proceeding 1800423 | Notice of Hearing - Valhalla Field | Canadian Natural Resources Ltd. |
July 31, 2014 - Final date for interested parties to file a request to participate. August 7, 2014 - Final date for CNRL to submit responses to any requests to participate. |
July 25, 2014 |
334 | Application 1771853, et al. | Notice of Resumption of Hearing - Grand Rapids Pipeline Project | Grand Rapids Pipeline GP Ltd. | July 04, 2014 | |
334 | Applications 1771853, et al. | Notice of Rescheduling of Hearing - Grand Rapids Pipeline Project | Grand Rapids Pipeline GP Ltd. | June 11, 2014 | |
334 | Applications 1771853, et al. | Notice of Postponement of Hearing - Grand Rapids Pipeline Project | Grand Rapids Pipeline GP Ltd. | June 02, 2014 | |
313 | Application 1764137 | Revised Notice of Hearing - Edmonton/Fort Saskatchewan Area | Inter Pipeline Ltd. | May 30, 2014 | |
312 | Proceeding 1779665 | Revised Notice of Hearing - Regulatory Appeal - Undefined Field | Prosper Petroleum Ltd. | May 05, 2014 | |
Application 1771853, et al. | Notice of Hearing - Grand Rapids Pipeline Project | Grand Rapids Pipeline GP Ltd. | April 29, 2014 | ||
313 | Application 1764137 | Notice of Scheduling of Hearing - Edmonton/Fort Saskatchewan Area | Inter Pipeline Ltd. | April 22, 2014 | |
314 | Application 1712215 | Notice of Cancellation of Hearing - Kirby Expansion Project | Canadian Natural Resources Limited | April 03, 2014 | |
313 | Application 1764137 | Notice of Hearing - Edmonton/Fort Saskatchewan Area | Inter Pipeline Ltd. |
April 9, 2014 - Final date for interested parties to file a request to participate. April 16, 2014 - Final date for response from the applicant on any request(s) to participate. |
March 24, 2014 |
312 | Proceeding 1779665 | Notice of Written Hearing - Regulatory Appeal - Undefined Field | Prosper Petroleum Ltd. | March 19, 2014 | |
311 | Application 1774949 | Notice of Scheduling of Hearing - Lloydminster Field | Canadian Natural Resources Limited | March 19, 2014 | |
Application 1759416 | Notice of Cancellation of Hearing - 00/03-22-049-06W4/0 Well - Wildmere Sparky G Pool | Husky Oil Operations Ltd. and Gear Energy Ltd. | February 12, 2014 | ||
311 | Application 1774949 | Notice of Hearing - Lloydminster Field | Canadian Natural Resources Limited |
February 18, 2014 - Final date for interested parties to file a request to participate. February 26, 2014 - Final date for response from the applicant on any request(s) to participate. |
February 03, 2014 |
312 | Proceeding 1779665 | Notice of Hearing - Regulatory Appeal - Undefined Field | Prosper Petroleum Ltd. |
February 3, 2014 - Final date for interested parties to file a request to participate. February 10, 2014 - Final date for the approval holder, Prosper Petroleum Ltd., to submit responses to any requests to participate. |
January 20, 2014 |
310 | Application 1759416 | Notice of Scheduling of Hearing - Wildmere Sparky G Pool | Husky Oil Operations Ltd. and Gear Energy Ltd. | January 14, 2014 | |
308 | Proceeding 1769924 | Notice of Hearing - Proceeding into Odours and Emissions from Heavy Oil Operations in the Peace River Area | January 02, 2014 | ||
310 | Application 1759416 | Notice of Hearing - Wildmere Sparky G Pool | Husky Oil Operations Limited and Gear Energy Limited |
December 16, 2013 - Final date for interested parties to file a request to participate. December 23, 2013 - Final date for response submissions from the applicants on any requests to participate. |
December 09, 2013 |
314 | Application 1712215 | Notice of Hearing - Canadian Natural Resources Limited - Kirby Expansion Project | Canadian Natural Resources Limited |
December 9, 2013 - Final date for submissions by all interested parties. December 20, 2013 - Final date for response submissions from CNRL. |
November 19, 2013 |
308 | Proceeding 1769924 | Notice of Submission Process and Schedule - Odours and Emissions from Heavy Oil Operations - Peace River Area | Alberta Energy Regulator | November 14, 2013 | |
314 | Application 1726915 | Notice of Rescheduling of Hearing - McLeod River Coalfield, Hinton Area | Coalspur Mines (Operations) Ltd. | October 23, 2013 | |
300 | Proceeding 1758441 | Notice of Cancellation of Review Hearing - Kimiwan Field | Baytex Energy Ltd. | October 21, 2013 | |
314 | Application 1726915 | Notice of Scheduling of Hearing - McLeod River Coalfield, Hinton Area | Coalspur Mines (Operations) Ltd. | October 03, 2013 | |
307 | Application 1743497 | Notice of Scheduling of Hearing - Willesden Green Field | ConocoPhillips Canada Operations Ltd. | September 23, 2013 | |
308 | Proceeding 1769924 | Notice of Proceeding - Odours and Emissions from Heavy Oil Operations - Peace River Area | Alberta Energy Regulator | September 18, 2013 | |
304 | Application 1739837 | Notice of Cancellation of Hearing - Elmworth Field | Encana Corporation | September 03, 2013 | |
314 | Application 1726915 | Notice of Hearing - Vista Coal Project McLeod River Coalfield, Hinton Area | Coalspur Mines (Operations) Ltd. |
September 10, 2013 - Final date for submissions by all interested parties. September 20, 2013 - Final date for response submissions from the applicant. |
August 15, 2013 |
304 | Application 1739837 | Notice of Hearing - Elmworth Field | Encana Corporation |
September 9, 2013 - Final date for submissions from Mr. Bourbeau September 20, 2013 - Final date for response submissions from Encana |
August 01, 2013 |
307 | Application 1743497 | Notice of Hearing - Willesden Green Field | ConocoPhillips Canada Operations Ltd. |
August 15, 2013 - Final date for submissions by all interested parties. August 22, 2013 - Final date for response submissions from the applicant. |
July 26, 2013 |
300 | Proceeding 1758441 | Notice of Adjournment of Review Hearing - Kimiwan Field | Baytex Energy Ltd | July 19, 2013 | |
299 | Application 1739263 | Notice of Cancellation of Hearing - Brooks Field | Husky Oil Operations Limited | July 10, 2013 | |
301 | Application 1749587 | Updated Notice of Hearing - Undefined Field | Koch Oil Sands Operating UCL |
August 15, 2013 - Final date for submissions by all interested parties. August 22, 2013 - Final date for response submissions from the applicant. |
July 09, 2013 |
305 | Application 1749543 | Notice of Hearing - Undefined Field | Teck Resources Limited |
August 1, 2013 - Final date for submissions by all interested parties. August 11, 2013 - Final date for response submissions from the applicant. |
July 09, 2013 |